The sidewalk has been glued down, but the windows haven’t been installed yet. One of the acrylic panes was badly scratched and needs to be replaced. Also, I’m waiting to figure out what I’m doing for a sign before installing the concrete veneer above the door.
All that is left to do here is touch up some areas of paint and then spray the sidewalk with a matte varnish (I’m using Krylon Matte Finish).